Forms

  • Photovoltaic (Solar) Generator Connection Form

    Jan 17
    Solar (or photovoltaic) energy is energy received by the earth from the sun and converted into electricity using technology such as photovoltaic (PV) panels on rooftops.  Solar is viewed as a clean, low cost renewable energy source.

    All embedded generator applicants must submit a Photovoltaic (Solar) Generator Connection Form and enter into a connection agreement with the Distributor before the generator will be allowed to connect to the relevant Distributors Network.  Concentrations of solar PV systems connected to the low voltage network can lead to power quality issues such as overvoltage and voltage unbalance.  The number of solar photovoltaic systems has increased at a high rate, with a trend toward larger capacity installations.      

    Distributors generally will require an applicant to complete a Pre-Approval of Small Inverter Connection Form before the system is installed or upgraded to ensure there is no power quality issues to the Distributors network, as part of the grid may not support the connection of solar.  The Pre-Approval Forms can be obtained from each Distributors website. 

    Contact an electricity retailer to discuss pricing (tariff) options. It is important to note there may be costs associated if a bi-directional meter exchange is required. Please request this information from your electricity retailer.
    Download 34 KB
  • Reconnection of Electricity Supply

    Jul 15
    The Reconnection of Electricity Supply form should be used by licensed electrical installation workers when reconnection of supply is required where the property has been off supply for greater than 12 months.

    Download 66 KB
  • Field Works Order

    Jul 15
    A correctly completed Field Works Order must be submitted to the relevant Retailer or Distribution Company where responsibility for associated Electrical Works Request charges are to be assigned to another person.
    (Note - Not all Distribution Companies accept this form)

    Download 75 KB
  • Electrical Work Request (EWR)

    Jul 15

    A correctly completed Electrical Works Request form must be submitted to the relevant Retailer or Distribution Company prior to the connection work taking place for:

    • all new installations or occupancy connections
    • all alterations and additions to existing installations or occupancies which require Distribution Company involvement (eg. metering alterations, connections of new consumers mains etc)
    • where the work may affect the distribution network, network assets or metering at the installation.

     An Electrical Works Request Guideline can be referenced to assist the accurate completion of the Electrical Works Request form for submitting to the customers Retailer or Distribution Company. Electrical Work Request User Guide.pdf

    Download 158 KB
  • Application for Abolishment of Electrical Supply

    Jul 15

    The Abolishment of Electricity Supply form should be used by owners or developers to request the permanent removal of all metering and servicing assets from a premise. Adequate notification should be given to the Distribution Company to complete this request. 

    • Supply connected - Submit to the customers Retailer as a final bill must be completed.
    • Supply not connected - Submit to the Distribution Company.

    (Note - Some companies may request payment for this service)

    Download 82 KB